ESTABLISHED IN 1983, Point West Engineering WORKS TO ENSURE THAT EVERY ASPECT OF A PROJECT IS DONE CORRECTLY.

PAGE IS STILL UNDER CONSTRUCTION

Below are pictures of just one, fairly typical, commercial stabilization

The building was definitely showing signs of sinking or becoming unstable.

SITE VISIT UNCOVERED EVIDENCE OF DEFINITE SINK HOLE ACTIVITY. While drilling for compaction grout the crew discovered 4 points where there where large voids underneath the building.

We installed a pin pier system from the limestone surface to the foundation and thereby were able to raise the building back to its original level.
There were large voids underneath the foundation resultant from sinkhole activity. We pumped chemical grout to fill the voids and help stabilization.